
Add to Cart
Injection mould material | mould steel P20,718,2738,2316,S136,NAK80,2344,SKD61,H13 | | | | |||
Mould time | 25-35 Days | | | | |||
Product time | 7-15 Days | | | | |||
Mould cavity | one cavity , multi-cavity or same different products be made together | | | | |||
Standard | HASCO, DME or dependent upon | | | | |||
Main technology | Milling, grinding,wire cutting, carving, EDM, lathes, surface finish, etc. | | | | |||
Software | CAD, PRO-E, Design time: 1-3days(normal circumstances) | | | | |||
Quality system | ISO9001:2008 | | | | |||
Establish time | 20days | | | | |||
Equipment | EDM,Cutting off Machine, plastic machinery, etc plastic part | | | | |||
Packing | Plastic bags, Cartons, wodden case,pallet , container,ect | | | | |||
product weight | 50-5000K | | | |